PDF Appendix G - Answers to Study Questions (REVISED) - Virginia Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. Community College Workforce Alliance | The Mission of CCWA is to meet . PDF 6 - Section 4 - Construction and Inspections - Henrico County, Virginia The joint consists of a tongue (male end) and groove (female end) with no defining areas for gasket material placement. Soils & Aggregate CCWA $ 350.00 $ 250.00 Handson proficiency will be scheduled upon . Length of run = 856 ft. (Pipe Diameter lift thickness) + (Fill above pipe lift thickness) (1 lift) = 3) (36 in. A drained pavement structure has a higher bearing capacity that can effectively support traffic loadings, and lead to long lasting pavement at the least maintenance cost. 1. When you learn and master soils inspection, your market value shoots up. 10) Backfill the trench using clean #8 or #57 aggregate as soon as practical, but not later than the end of each working day. In a flexible pipe this zone must protect the pipe from distortions due to loading extend to 12 above pipe. kYPPc^KZ\"}JT9VBd[
/Le UJs]VOk:SZ VDOT: Soils and Aggregate Compaction - Community College Workforce Alliance In addition to, 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction, QUALITY, PERFORMANCE AND ECONOMY COMBINED LANE S HDPE DRAINAGE PIPE Scan for more information on Lane s HDPE product line. Silt Tight: A joint that is resistant to infiltration of particles that are smaller than particles passing the No. bc the dense gradation provides more strength by filling voids. 5) True or False. For larger diameter pipe, >30 inches, embedment materials should be worked under the haunches by hand. PDF Aashto Soil Classification Sheets - hldm4.lambdageneration.com No additional payment will be made for the repair or replacement of existing concrete damaged, ITEM NO. ITEM NO. Additional temporary fill is needed to protect the pipe from construction loads. 402.02. B. PDF 02210 - TRENCHING, BACKFILLING AND COMPACTION OF UTILITIES - Lynchburg CHAPTER 4 STUDY QUESTIONS 2) True or False. 3 0 obj
It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS 701.01 DESCRIPTION. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix D | 1 Fillable Online VDOT Soils and Aggregate Compaction Fax Email Print Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent, Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. PIPE BACKFILL LEARNING OUTCOMES INTRODUCTION. VDOT Soils and Aggregate Soils and Aggregate Compaction Technician MARTCP. June 21st, 2018 - 2018 Soil Classification and Compaction Proficiency Samples 177 according to the AASHTO or the data sheet Shrinkage Factors of Soils by the . 4) Provide a minimum 0.5 to 1% longitudinal slope to enhance positive drainage. GRIT Manual. Haunching material may be Class 1 and must be placed and compacted in 6 inch loose/4 inch compacted maximum lifts, compacted to 95 percent standard proctor density. xZKs2>Ip P7[Sq9FoLLmJgl~K"5JtB2+!765nt-8\Gf._o{}E Download Free PDF. And the pipe must provide structure, because if the ground above the pipe collapses then the pipe can no longer perform as a conduit. 1. How far should the hammer fall?, What are the moisture and density content corresponding to the peak of the curve . Do not compact. Larry Ritchie, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction), Table 4.9 Storm Drain Inlet Protetion Applicable for, INSTALLATION GUIDE. Virginia Department of Transportation documents: Road and Bridge Specifications and appropriate supplemental specifications Virginia Test Methods Manual Road and Bridge Standards. 5.01 Design, PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS, SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO), TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe. This course includes downloadable resources including a procedural outline and a pdf of the standard, instructional video content, interactive knowledge checks, and a self . The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. SOILS AND AGGREGATE FIELD CERTIFICATION STUDY GUIDE 2015 Prepared by: The Virginia Department of Transportation, Materials Division Note: The information included in this manual is generally compatible with current VDOT Speci cations and instructions; however, it should not be considered a source book for speci cations. Installation PowerPoint for Grasscrete Formers, Specifications for Residential Property Owners Connection to New Public Sewer, DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES, SECTION 200: STORM SEWER CONSTRUCTION STANDARDS, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. eG%\!9]y7WS{t
m+zVjO!s[tG{y Q3@CJY1 9&. 0
hb```f``2g`2X@Y809wCc
cRBTK@S0UYB:d P&t%iV'XhS:Ku.0%7Q4~Av{iL^$x0%Prmc*700x\65;kYw;^(ew5efv] qKZS;\c zr
Gg^tL)QMpJhzHrEO
*~\,g -. \@%+TB)9~D ru^j:c;1JJ u]5ZU._] ueV^+/5 4 in.) large void spaces and is loosely compacted. Install Pipe The grade of the pipe should always be monitored during installation. PDF Pavement Design Guide for Subdivision and Secondary Roads in Virginia General: CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Do not compact directly on pipe as it may damage the pipe. To prevent sloping soils from becoming. What classification systems does VDOT use to classify soils? This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. The camera must have the means to measure deformation/deflection of the pipe. 3. AASHTO T180 The Moisture Density Relations of Soils using a 10-pound Rammer and an 18-inch drop. 12) How long after installation is complete can the video inspection can be done? Locally Administered Projects Manual Updates and Materials Quality Assurance Plan Requirements May 11, 2015. Similarly, VDOT will recognize NICET Construction Materials Testing Level II Certification in Concrete. 32-02.05 Precast Manhole Sections and Castings. Excavate Trench Proper trench widths will allow for proper compaction alongside the pipe. STORM SEWERS. 7-1 7.2. What is the moisture content at which soil can be compacted to its maximum dry density with the least amount of comparative effort called? 7) What is the maximum height of cover for a 48 inch pipe diameter Class IV concrete pipe culvert? If the soils is 100 percent saturated and the voids are full of water and has a high MC. Proper haunching provides support to ensure the pipe s strength is achieved. Soiltight joints provide protection against infiltration of backfill material containing high percentage of coarse grain soils, and are influenced by the size of the opening (maximum dimension normal to the direction that the soil may infiltrate) and the length of the channel (length of the path along which the soil may infiltrate). 2016v1.0 Chapter 4 10, 11 Place Bedding Stable and uniform bedding must be provided for the pipe and any protruding features of its joints and/or fittings. The exploration should extend to a depth equal to per foot of fill height or 8, whichever is greater. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Unsuitable or unstable foundations may be undercut and replaced with a suitable bedding material, placed in 6 lifts. PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. 200 sieve (75 micrometers). container, large spoon, and 1.1 lbs. All materials and workmanship, TABLE OF CONTENTS NO. 1. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth. Conducts and/or observe and document test on soils, asphalt, concrete, aggregates, bituminous products, metal products and industrial coatings. American Water Works Association PDF Appendix B - Virginia Department of Transportation - Home
This type of joint provides a leak resistant joint when a profile gasket is used. suzanna_gevorgyan. VDOT Materials Certification Schools - Business - Virginia San Antonio Water System Standard Specifications for Construction ITEM NO. 9) The outlet pipe is connected to the back of the end wall. 4 in.) The goal shall be to collect, C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. VDOT Materials Certification Schools - Business | Virginia Department The current deadline to have Soils and Aggregate Proficiency exams completed by is . The moisture content at which a soil can be compacted to its maximum dry density with the least amount of comparative effort is called the optimum moisture content. PDF Establishing Theoretical and Target Values for Density and Moisture Content Consistency refers to the texture and firmness of a soil. americanwick.com 800.242.WICK (9425). 15) What end of the pipe system do you start installation? 2 0 obj
129 0 obj
<>
endobj
%PDF-1.5
%
VDOT: Soils and Aggregate Compaction - Community College Workforce Alliance Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections, CHAPTER 9 SEWER / STORM DRAIN / IRRIGATION LINES SECTION 9.01 GENERAL This section covers the requirements for piping materials and installation of Lehi City sewer, storm drainage and irrigation collection. Testing is no longer mandatory on the last day of class. 19 terms. Additionally, a copy shall be furnished to local VDOT Asset Management personnel to document the pipe/culvert condition at that point in time. 500 grams is the minimum sample required for soils and for aggregate the sample size depends on the Nominal Maximum Size Aggregate. 14) What is the maximum deflection allowed for flexible pipe? The values are often affected by varying percentages of large aggregate which consultants and contractors do not usually put into consideration. Verifying that the correct pipe has been delivered for the applications on your project. SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 4 in.) When standing water is in pipe foundation area, No. 2016v1.0 Chapter 4 7, 10 General procedures for pipe installation: 1) Locate utilities 2) Excavate trench 3) Explore foundation INSTALLATION PROCEDURES 4) Place structural bedding material to grade. VDOT - Certifications Classes - Community College - Modern Campus Students must bring valid ID & attend class in order to test. Try Now! VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1